Construction Business QuickBooks CleanupCosts on the job that caused them
A cleanup starts by giving every bill a job, including the day the work slipped.
Name the jobWhy the pile feels fine until it does not
Most messy files were built by someone who was busy, not careless. A lumber ticket, a dumpster, a Friday of labor. Each one got typed into a general account because the job name was not in front of the person at the keyboard. For a while the profit report still looked smooth. Then a job finished and the cash was not there.
The comparison that matters is simple. What did you think the job would cost, and what did it cost. Materials named in the contract should be the materials charged to the job. When those two lists drift, the report is a story. We rebuild the list from invoices, not from a wish.
Time is a cost, including a slipped pour
The first cold morning a crew reaches for a hoodie, a pour often slips. Everyone on the job feels that. The books should feel it too. An idle day is time on that job, not a vague extra in the bank account and not a personal expense to be sorted later.
We would rather show a job that ran long than a job that looks perfect and a bank account that does not. Owners recognize the relief. The number may be less pretty. It is a number you can take to a lender without narrating around it.
What we ask you to send
Send the estimate, the contract price, and the invoices that worry you. If a change was agreed in the field and never written down, say so. We will not invent the change. We will park the question where both of us can see it until the paper exists.
Labor belongs on the job the people worked. If the wage file only says a week, and not a job, that is a setup problem we fix going forward. A provider runs payday. We make the file able to carry a job.
Which job should we open first
Name the job whose profit you no longer believe.
You will be talking to the Steven Palmieri practice.